A builder's schedule and a homeowner's schedule are different animals. Planning around that gap beats fighting it.
A homeowner thinking about an addition is usually thinking in a single timeline: design, then permit, then build, then move in. A builder is running several projects at different stages at once, in a market where permitting offices are also processing a high volume of new-subdivision work in the same growth corridor. Those two realities don't automatically line up, and the gap is where most scheduling frustration comes from.
In a fast-growing corridor, plan review and inspection scheduling take however long the city's queue takes that month, and it is not something a builder controls. Asking for a firm permit-approval date is asking for a number nobody actually has.
Whether you go design-then-bid or design-build, finishing a design that's actually ready to permit takes real time, and rushing it tends to generate the change orders that stretch a project further than skipping ahead would have.
Certain structural components and custom-order items can have their own lead times that don't move regardless of how fast everything else goes. A builder who tells you this early, before it becomes a surprise mid-project, is doing the sequencing conversation correctly.
Ask any builder you're considering for their honest current backlog, not their best-case scenario. Ask what stage of the project historically causes the most delay on jobs like yours. A builder willing to answer both plainly is more useful than one who only gives you the number you want to hear.
If you have any flexibility on move-in or completion date, use it. A schedule with slack absorbs a permitting delay or a backordered material without becoming a crisis; a schedule with none turns every delay into one.